Request a bid
Drilling Services · 30 years in groundwater

Subsurface data your design can stand on.

Geotechnical borings, monitoring wells and resource protection wells across Western Washington. We drill to your plan, log to your format, seal every hole and file the paperwork.

CAPABILITY SUMMARYREV. OCT 2026
Entity
Advance Drill Technologies, Inc.
Licence
Licensed WA well construction contractor
L&I
ADVANDT823DB
Experience
30 yrs in groundwater · 8 yrs as Advance Drill
Safety
WA L&I experience factor 0.86 (2026)
Services
Geotech borings · MW · RPW · decommissioning
Standard
WAC 173-160 · Ecology NOI + well reports
Area
Western Washington, Monroe base
Response
Reply within 1 business day
Public-agency boring logs name us as driller, e.g. City of Kirkland, 2025.
Licensed WA well contractor Ecology notices and well reports filed L&I contractor ADVANDT823DB L&I experience factor 0.86 · claim-free
Who we drill for

Built around the people who read the logs

GEOTECHNICAL ENGINEERS

Borings to your plan

Sampling intervals, methods and log format to your specification. Field changes are called in, not decided on the rig.

ENVIRONMENTAL CONSULTANTS

Wells that pass review

Monitoring and resource protection wells built, developed and decommissioned to WAC 173-160, with well reports filed.

CIVIL & STORMWATER DESIGNERS

Infiltration feasibility

Borings and groundwater monitoring wells for the site investigation that infiltration design depends on.

ARCHITECTS & DEVELOPERS

Early answers

Know what's under the site before the foundation scheme and stormwater approach are set.

For architects →
PUBLIC AGENCIES

Small-works ready

Utility, stormwater and facility projects.

Tight schedules

A small, owner-run crew means one call reaches the person who decides whether the rig moves tomorrow.

Why firms use us

A driller who respects your report

Logs you can use

Consistent field descriptions and depths, in your format, so your engineer isn't rewriting them.

Paperwork handled

Ecology notices of intent at least 72 hours ahead, utility locates, and well reports within 30 days of completion.

Local ground

30 years of holes in Western Washington till and outwash. We know where the rig will struggle before we mobilise.

Clean sites

Cuttings and water handled to your plan. Holes sealed and surfaces restored, so the property owner has nothing to complain to you about.

Project types

Recent work

Red tracked drill rig loaded on a lowboy trailer
Track-mounted rig, ready to mobilise.
Advance Drill Technologies truck towing the drill rig on a trailer
Our own truck, rig and crew.
Also from Advance Drill Technologies

Advance Drainage Services

Residential and small commercial drainage, from the same crew, built on the same knowledge of the ground. Useful for your clients once the building is up.

Visit Advance Drainage Services